Wednesday 12 October 2011

[MP] Pitch Feedback

We presented our pitch to the class, another media studies teacher and a temporary technician on 10th October. We gained the ‘green light’ with a number of issues suggested that will need to be sorted before we start filming our music video production.

Locations
We are planning on filming an amount of our narrative in Dunorlan Park as we feel that this location will give us a lot of opportunity to shoot interesting footage. We already have some footage from Brighton that could be used in our production. The issue that was raised was that we would have to find out how well the footage from Brighton will integrate with footage from Dunorlan Park. To find this out we will do a location reccie to Dunorlan Park and edit a short length of film so that we can assess the result.

Lighting
The performance part of our narrative is to be filmed in the drama studio that has a full lighting rig. We will need to try out the lights to see what different effects can be achieved, and what looks good on screen. We are also thinking about using a green screen, and this is another piece of equipment that will need to be tested to see if it is worth spending the time editing the raw footage that contains the green screen.

Characters
All of the character roles have been assigned apart from our second girl. Having two different girls will be an essential part of our narrative, so casting our second actress is an issue that must be addressed promptly.

No comments:

Post a Comment